Project: O’Hare Airport Garage Renovation
Engineer: McDonough Associates
Location: Chicago, Illinois
Contract Amount: $8,000,000.00 (as subcontractor)
Scope:
Concrete Restoration
Waterproofing
Repair Surface Scaling
Remove Failed Traffic Coating
Partial Depth Floor Repair
Remove Existing Expansion Joints
Full Depth Floor Repair
Install New Expansion Joint Seals
Remove Curbs
Seal Assorted Cracks by Various Methods
Replace Concrete Washes
Caulk Control & Construction Joints
Re-profile Supported Slabs
Install New Traffic Coating System
Place Supplemental Reinforcing Steel
Install a Thin Bonded Epoxy Overlay
Vertical Concrete Repairs
Install a Buried Waterproofing Membrane
Installed Carbon Fiber Wrap Reinforcing
Shotblast and Install Silane Sealer
Post-Tension Repairs
Site Conditions:
One of the largest and Busiest Parking Garages in the World
Throughout the Restoration the Facility Remained Open 24 Hours per Day, Seven Days per Week
Required Extensive Control and Coordination of Pedestrian & Vehicular Traffic
Containment of all Dust and Debris within the Construction Area
More than Fifty Separate Construction Phases Over Three Years
|